# How do I schedule the follow-ups of a sequence in Sarbacane Engage?

Choose how many days after the previous step, and from what time, your sequence's follow-ups go out.

In Sarbacane Engage, each step of a sequence goes out a certain number of days after the previous one, from a given time. You set these two values before adding contacts: in a running sequence, they can no longer be changed.

## Prerequisites

-   A Sarbacane Engage licence.
    
-   Being the owner of the sequence.
    
-   A sequence that is not running yet.
    

**Important** A new step is set by default to go out from 5 pm (and 2 days after the previous step in a classic sequence). Check this setting every time you add a step.

## Steps

For a classic sequence:

1.  In the left menu, click the sequences icon (paper plane), then the name of the sequence.
    
2.  In the top left, stay on the **My sequence** tab.
    
3.  In the list of steps on the left, click the delay block above the step to set (for example **+3 days**).
    
4.  Under **Number of days**, set the delay with the **−** and **+** buttons. This is the number of days after the previous step.
    
5.  Under **Time window**, click the time from which the step should go out.
    
6.  In the top right, click **Save the sequence**.
    

For a conditional sequence:

1.  In **My sequence**, on the step's block in the diagram, click the pencil to the right of the delay (for example "+1 day (17h-18h)").
    
2.  Under **Delay in days**, set the number of days with **−** and **+**.
    
3.  Under **Delay in hours**, enter the time from which the step goes out (for example 17 for 5 pm).
    
4.  In the top right, click **Save the sequence**.
    

## Expected result

The step shows its delay and start time, for example "+3 days (9h-10h)".

**Note** The time window is a starting point: "9h-10h" means "from 9 am". Emails in the same window are spread at random over the hour, so they look more natural. If there are too many for your sending quotas, the rest go out in the following windows, or the next day at the same time.

## Troubleshooting

### My follow-ups go out at 5 pm although I didn't choose it

This is the default time for a new step. Open the step's delay and choose another time before adding contacts.

### A follow-up went out later than planned

Check, in this order:

1.  The sequence's sending schedule allows this day and time. Days that are not allowed still count in the delay: a follow-up planned for a Sunday goes out on Monday.
    
2.  The number of sendings per hour and per day chosen when adding the contacts has not been reached.
    
3.  The account's sending quotas (Email section of the settings) have not been reached by your other running sequences.
    

### I can't change the delay or the time

The sequence is running. Duplicate it and set up the copy for your new contacts.

## Related articles

-   [Sarbacane Engage: how to create, edit, and use a sending schedule for your prospecting email sequences](https://help.sarbacane.com/en/articles/249.md)
    
-   [How do I add contacts to a sequence in Sarbacane Engage?](https://help.sarbacane.com/en/articles/470.md)
    
-   [How do I edit a running sequence in Sarbacane Engage?](https://help.sarbacane.com/en/articles/469.md)