---
title: "How do I add a task to a Sarbacane Engage sequence?"
description: "Schedule manual actions in your sequences and validate them in Connect so that the sequence continues."
url: https://help.sarbacane.com/en/articles/486-how-do-i-add-a-task-to-a-sarbacane-engage-sequence
collection: "Engage : les séquences"
updated: 2026-11-25
language: en
alternates: [es, fr]
---

# How do I add a task to a Sarbacane Engage sequence?

Schedule manual actions in your sequences and validate them in Connect so that the sequence continues.

A task step reminds you of an action to carry out yourself (find information, prepare an exchange) at the right moment of the sequence. You find it in the Connect extension, and you must validate it there for the sequence to continue.

## Prerequisites

-   A Sarbacane Engage licence.
    
-   The [Connect](https://chromewebstore.google.com/detail/connect/claekkfnhepphhinadlbhkhpgkjknkep) extension added to Chrome, to validate tasks.
    

## Steps

**Add the task to the sequence**

1.  In the left menu, click the sequences icon, then the sequence you want.
    
2.  In the sequence tab, at the bottom of the left column, click the button to add a step.
    
3.  In the type, click **Task**.
    
4.  Fill in the task title, then the task information (instructions, for example). You can insert variables.
    
5.  Set the step delay, then click **Save the sequence**.
    

**Important** A task must be validated in Connect for the sequence to continue. Otherwise, the following steps are postponed until it is validated.

**Validate the task in Connect**

6.  When a task is due, a badge appears on the Connect extension icon in the Chrome toolbar. Click the icon to open Connect.
    
7.  Open the tasks tab (the number shows how many tasks are due).
    
8.  Choose overdue, today, tomorrow, upcoming or done, then click the task.
    
9.  Once the action is done, click the save and next button: the task is validated.
    

## Expected result

The task moves to done, and the sequence moves to the next step for this contact.

## Troubleshooting

### The following steps of my sequence have been postponed

A task has not been validated in Connect. Open the tasks tab, then overdue, and validate the task.

## Related articles

-   [How do I create a prospecting sequence in Sarbacane Engage?](https://help.sarbacane.com/en/articles/270.md)
    
-   [How do I schedule the follow-ups of a sequence in Sarbacane Engage?](https://help.sarbacane.com/en/articles/473.md)
    
-   [Install the Connect extension](https://help.sarbacane.com/en/articles/226.md)
